2026 operating EPS guidance
$6.25–$6.55
Raised from $6.15–$6.45 with second-quarter results, Jul. 30, 2026
Contracted load through 2030
69 GW
Up 6 GW in Q2 2026; 45 GW ERCOT, 18 GW PJM, 6 GW SPP
Five-year capital plan
$78B
2026–2030, raised from $72B in May 2026
30-year Treasury
5.42%
Par yield, Oct. 20, 2026; 5.63% at the Sept. 30 quarter-end
AEP dividend yield
3.05%
$0.97 quarterly rate annualized at the Oct. 21, 2026 close of $127.22
Rate base growth
~11% CAGR
Through 2030, from about $85B estimated for 2026
The event
A $0.10 Raise on Top of a $78 Billion Plan
AEP raised full-year 2026 operating earnings guidance to $6.25–$6.55 a share on July 30, 2026, from $6.15–$6.45 — $0.10 at both ends, about 1.6% of the mid-point. Second-quarter operating earnings of $742 million, or $1.36 a share, took year-to-date operating EPS to $3.01, and management kept the 7%–9% annual growth target and a compound rate above 9% through 2030. Moves the guidance mid-point 1.6% while the contracted load grew 6 gigawatts in a single quarter.
| Item | Figure | As of |
|---|---|---|
| 2026 operating EPS guidance | $6.25–$6.55 (from $6.15–$6.45) | Q2 results, Jul. 30, 2026 |
| Q2 2026 operating EPS | $1.36 on $742M of operating earnings | Q2 results, Jul. 30, 2026 |
| Year-to-date operating EPS | $3.01 ($2.92 GAAP) | Q2 results, Jul. 30, 2026 |
| Contracted load through 2030 | 69 GW | Q2 results, Jul. 30, 2026 |
| Capital plan 2026–2030 | $78B (from $72B) | Raised May 5, 2026 |
| Rate base | ~$85B in 2026E, ~11% CAGR to 2030 | Q2 deck, Jul. 30, 2026 |
| FFO/debt | 14.6% S&P, 14.0% Moody's, target 14%–15% | Jun. 30, 2026 |
| Quarterly dividend | $0.97, up 2.1% | Declared Oct. 20, 2026 |
The raise itself is the least interesting line in the release. The interesting part sits on the balance sheet: AEP holds roughly $5 billion of Department of Energy loans and nearly $400 million of grants that cut the interest cost of the buildout, and it pre-funded the equity with a $3 billion forward sale executed in May 2026 that settles by May 2028. Locks in the funding for rate-base growth before the load arrives, which is the one thing the last utility capital cycle did not manage.
The demand
69 Gigawatts Is the Asset; 195 Gigawatts Is the Promise
AEP's load story is now a conversion story, and the conversion rate is the number that matters. Of the roughly 195 GW sitting in the utility's active interconnection queue, 69 GW is contracted through 2030 — 45 GW in ERCOT, 18 GW in PJM and 6 GW in SPP — so about a third of the pipeline is under signed agreement, and nearly $2 billion of customer cash and collateral stands behind the 45 GW submitted into ERCOT's Batch Zero process. Signs up about 35% of the 195 gigawatts in its queue and builds $78 billion of rate base on the smaller number.
Contracted load against the unsigned queue
AEP's roughly 195 GW active interconnection queue, of which 69 GW is contracted through 2030.
Unit: GW
ERCOT contracted
45
PJM contracted
18
SPP contracted
6
Unsigned queue remainder
126
That conversion is now being audited. AEP Ohio's load forecast as of February 2026 reflected signed contracts for 17.8 GW of data-center demand running through 2035, and a March 2026 regulatory staff filing alleged double-counting in the utility's expected growth. Turns a 69 gigawatt contract book into a contested forecast that only completed interconnections can settle.
The bargain
The Tariff Is the Product: Who Pays Was Settled This Summer
AEP's large-load tariffs are the mechanism that decides who pays, and they hardened through the summer. The company has approval in five of the eight states where it has filed, with Michigan, Oklahoma and SWEPCO Texas still pending; the filings require customers to take or pay for 80% to 90% of contracted demand under contracts running as long as 20 years, with termination-fee collateral. In Ohio the threshold is 25 MW and the term is 12 years; in Virginia it is 100 MW individual or 150 MW aggregated for 14 years; in Kentucky, 150 MW buys 20 years.
| Operating company | Minimum size | Contract term | Termination-fee collateral | Status |
|---|---|---|---|---|
| AEP Ohio | 25 MW | 12 years (incl. 4-year ramp) | Required | Approved |
| Appalachian Power (Virginia) | 100 MW individual / 150 MW aggregated | 14 years (incl. 4-year ramp) | Required | Approved |
| Appalachian Power (West Virginia) | 100 MW individual / 150 MW aggregated | 12–17 years | Required | Approved |
| Indiana Michigan Power (Indiana) | 70 MW individual / 150 MW aggregated | 12–17 years | Required | Approved |
| Kentucky Power | 150 MW | 20 years | Required | Approved |
| Michigan, Oklahoma, SWEPCO Texas | 50–150 MW | 2–20 years by size | Mixed | Pending |
- PUCO's August 2026 order makes the data center cover the cost of the infrastructure and requires 180 days' notice before a customer connects to AEP's grid.
- The Department of Energy's own Ohio fact sheet says SB Energy and AEP will agree a dedicated data-center rate structure so the project — not Ohio families or small businesses — pays for the new plants and transmission lines, 'whether they use the power or not.'
- SB Energy has committed $4.2 billion of new transmission investment with AEP Ohio for the 10 GW Piketon campus, backed by 9.2 GW of new gas generation.
- AEP says the load supports up to $16 billion of cost offsets for residential customers, plus about $1.4 billion of savings from federal loan guarantees and grants.
Here is what the framing gets wrong. These terms are excellent for the utility and harsh for the data center: a 12-year obligation to pay for at least 80% of contracted megawatts, against hardware that turns over every three to four years, is a fixed cost sitting on a depreciating asset. Moves volume risk off the ratepayer and onto the hyperscaler's balance sheet, and that is precisely the trade a 5.42% long end makes necessary.
The funding
$45.5 Billion of Debt Into a 5.42% Long End
This is where the 5.42% enters the story. AEP's 2026–2030 financing plan funds a $77.9 billion capital and joint-venture equity contribution with $47.1 billion of cash from operations, $45.5 billion of net debt issuance and $9.7 billion of equity — dividend reinvestment, an at-the-market program and settlement of the March 2025 and May 2026 equity forwards. Covers less than half the capital plan with internal cash, leaving debt to do the rest at the long end.
How AEP funds the 2026–2030 capital plan
AEP's planned sources of funds against a $77.9 billion capital and joint-venture equity contribution.
Unit: $ billion
Cash from operations
47.1
Net debt issuance
45.5
Equity (DRIP, ATM, forwards)
9.7
The cost of that debt is already visible. Interest expense rose 19.2% in the second quarter to $585 million while revenue grew 7.0% to $5.45 billion; total debt was 14.8% higher year over year at $53.5 billion, and diluted share count rose 2.7% to 550.6 million as the forward sales settled. Moody's put FFO/debt at 14.0% at June 30 against a 14% to 15% target, with S&P at 14.6%. Leaves no credit headroom to absorb a rate shock without more equity.
The hedge is the federal government, and it is large. AEP holds roughly $5 billion of Department of Energy loans — including up to $3.3 billion supporting nearly 100 AEP Texas transmission projects, worth $685 million in customer interest savings — plus nearly $400 million of grants. Subsidizes the cost of the money that builds the grid, which is the quiet reason the ratepayer fight has not become a ratepayer fight.
The spread
The Whole Argument Is 9.84% Minus 5.42%
Strip the story down and only one subtraction matters. AEP's most recently settled returns — 9.84% in Ohio, 9.75% in West Virginia and Kentucky, 9.65% in Arkansas — against a 30-year Treasury at 5.42% leave an authorized equity spread of roughly 4.2 to 4.4 points. A year earlier, with the 30-year at 4.95%, the same authorizations implied 4.7 to 4.8 points. Compresses the authorized equity spread by about 30 basis points in twelve months, and AEP's three pending cases — 10.75% on $95 million for SWEPCO Texas, 10.5% on $299 million for PSO Oklahoma, 10.5% on $61 million for APCo Virginia — are attempts to win it back.
Authorized and requested returns against the 30-year Treasury
Settled and pending AEP returns on equity versus the 30-year Treasury par yield of 5.42% on Oct. 20, 2026.
Unit: %
SWEPCO Texas requested
10.8%
PSO Oklahoma requested
10.5%
APCo Virginia requested
10.5%
AEP Ohio approved
9.8%
Appalachian Power W.Va. approved
9.8%
Kentucky Power approved
9.8%
SWEPCO Arkansas approved
9.7%
30-year Treasury
5.4%
The market has already voted on the discount rate rather than on the earnings. Utilities fell 13.0% in the third quarter of 2026, the worst of any S&P 500 sector, while the 30-year ended that quarter at 5.63% against 4.95% at the end of 2025. AEP is the most rate-exposed version of the trade: the highest trailing multiple in its peer group, near the highest leverage, and a dividend yielding 3.05% against a 5.42% risk-free bond.
| Company | Price | Trailing P/E | EV/EBITDA | Net debt/EBITDA | Dividend yield | Trailing ROE |
|---|---|---|---|---|---|---|
| AEP | $127.22 | 22.1x | 14.2x | 6.2x | 3.03% | 10.0% |
| Duke Energy | $121.15 | 18.0x | 10.6x | 5.2x | 3.57% | 9.9% |
| Southern Company | $90.71 | 21.9x | 12.3x | 5.1x | 3.34% | 11.5% |
| NextEra Energy | $78.86 | 17.9x | 15.4x | 6.1x | 3.10% | 11.7% |
| Dominion Energy | $62.84 | 21.7x | 14.2x | 6.9x | 4.29% | 8.3% |
The supply chain
The Suppliers Get Paid First, and Get Paid More Expensively
The buildout has an order book upstream, and it is concentrated. AEP has secured about 13 GW of gas-fired turbine capacity for deployment through 2031, including 3 GW added in the second quarter, and holds options on up to 10 GW more through 2035 under framework agreements with GE Vernova and Mitsubishi. Puts 13 gigawatts of generation demand behind a regulated balance sheet, with $24 billion of generation capital behind it and GE Vernova's gas backlog at 116 GW in July.
| Eaton metric | Q2 2026 | Q2 2025 | Change |
|---|---|---|---|
| Electrical Americas backlog | $15,175M | $11,377M | +33% |
| Electrical Americas organic orders | +41% | — | Book-to-bill 1.3 |
| Electrical Americas operating margin | 27.5% | 29.5% | -2.0 pts |
| Electrical Global backlog | $3,602M | $1,771M | +103% |
| Electrical Global organic orders | +33% | — | Book-to-bill 1.1 |
| Electrical Americas net sales | $3,951M | $3,350M | +18% |
Grid equipment is the constraint that rations AEP's rate base, and it shows up in order books rather than headlines. But the margin line is where the read-through gets interesting: Eaton's Electrical Americas operating margin fell to 27.5% from 29.5% while backlog grew a third, so the equipment suppliers are converting AI demand into volume faster than they are converting it into profit.
Next 90 days
October 28 Is the First Test, and the Tariff Calendar Runs to Year-End
- Oct. 28, 2026: third-quarter results and a new capital plan — consensus is $2.04 a share on $6.55 billion of revenue, and management said on the July call it will introduce a five-year 2027–2031 plan at this call.
- The September investor handout flagged line of sight to more than $10 billion of capital beyond the $78 billion plan; at the same ~58% debt mix, that is about $5.8 billion of extra debt and roughly $315 million of annual interest at a 5.42% long end.
- Q4 2026: a commission order is expected on the SWEPCO Texas base-case settlement, which is where the 10.75% requested return meets the long end.
- Rest of 2026: tariffs in Michigan, Oklahoma and SWEPCO Texas decide whether the 80%–90% take-or-pay floor holds across the footprint.
- Dec. 10, 2026: the first payment on the $0.97 quarterly dividend, a 2.1% raise that keeps the payout ratio near 60%.
Watch one line in the release: new contracted gigawatts. Six were added in the second quarter. If the third quarter adds less, the ~11% rate-base CAGR becomes a function of rate-case outcomes rather than of demand, and the 5.42% long end stops being an environment and starts being a constraint. Turns the next print into a test of the demand assumption, not the earnings assumption.
2027 to 2031
Three Ways This Breaks
- Long-end risk: a 50 basis point rise in the required return is worth roughly $17 a share on the dividend arithmetic above, and the 2027–2031 plan needs tens of billions of new debt priced into that same curve.
- Conversion risk: only 69 GW of a ~195 GW queue is contracted, a March 2026 Ohio regulatory staff filing alleged double-counting in AEP Ohio's data-center growth, and the Ohio forecast itself counted 17.8 GW of contracts running to 2035.
- Counterparty risk: 12- to 20-year take-or-pay terms are only as good as the credit behind them, and in Ohio the credit behind the OpenAI lease is NVIDIA's — up to $105 billion of guarantee, plus $15 billion invested in SB Energy.
That third risk is the one no rate case can fix. If hyperscaler capital intensity slows, the take-or-pay contracts keep paying while the load behind them does not, and a utility that has spent $33 billion on transmission is left holding a 12-year obligation from a counterparty whose hardware turns over in three to four years. Turns the utility's largest rate-base story into a credit exposure once the steel is in the ground.
| Demand-side datapoint | Figure | Period |
|---|---|---|
| NVIDIA total revenue | $96.2B, up 106% | Quarter ended Jul. 26, 2026 |
| NVIDIA data center revenue | $89.0B, up 117% | Quarter ended Jul. 26, 2026 |
| NVIDIA cash and marketable debt securities | $56.6B | As of Jul. 26, 2026 |
| Meta capital expenditure | $31.1B | Q2 2026 |
| Meta 2026 capital expenditure range | $125–145B | Raised Jul. 29, 2026 |
| Amazon 2026 capital spending guidance | $220B | Raised Jul. 30, 2026 |
| Amazon AWS revenue | $42.2B, up 37% | Q2 2026 |
The demand behind those contracts is not a forecast; it is a spending spree already under way, and it is funded in the same capital markets that AEP needs. Amazon raised 2026 capital spending guidance to $220 billion while its trailing free cash flow turned negative, and Meta's second-quarter capital expenditure of $31.1 billion was funded out of $31.9 billion of operating cash flow. Funds AEP's rate base and its own obligations from the same pools of money, which is the concentration risk nobody prices into a 12-year take-or-pay.
The verdict
So Who Actually Pays?
- Ratepayers: largely insulated where the tariffs apply, because 80%–90% of contracted demand cost, plus termination-fee collateral, sits with the data center — but still exposed through PJM capacity prices, which have risen more than tenfold since May 2025.
- Data-center operators: paying for the grid in advance for 12 to 20 years, including the SB Energy structure where the project pays for new plants and transmission 'whether they use the power or not.' That is the price of speed in a queue that converts at about 35%.
- Shareholders: left holding the discount rate. AEP's 3.05% yield is 237 basis points below the 30-year, its 22.1x trailing multiple is the highest in the peer group, and 11% rate-base growth runs 2 to 4 points above 7%–9% per-share growth, so the wedge is paid in dilution and interest rather than in earnings.
Who owns which end of the AI power chain
- Locks 69 GW of signed load behind an ~11% rate-base CAGR through 2030, with five of eight large-load tariffs approved and take-or-pay terms running to 20 years.
- Moody's FFO/debt of 14.0% at Jun. 30, 2026 sits at the bottom of the 14%–15% target, so the 2027–2031 plan leans on pre-funded equity and roughly $5 billion of federal loans.
- Near term, the Oct. 28, 2026 call unveils a new 2027–2031 capital plan; September disclosure flagged line of sight to more than $10 billion beyond the $78 billion.
- Over 1–3 years, a 22.1x trailing multiple, 6.2x net debt to EBITDA and a 3.05% yield 237 basis points below the 30-year make the discount rate the swing factor.
- Supplies part of AEP's 13 GW of secured turbine capacity, with the utility holding options on 10 GW more through 2035 and a 116 GW gas backlog at the maker.
- Generation is 31% of AEP's $78 billion plan at $24 billion, so turbine demand is underwritten by a regulated balance sheet rather than by merchant power prices.
- At 26.1x trailing earnings the order book is largely priced; the 1–3 year risk is AEP deferring the 2028–2030 tranche if long-end rates stay near 5.4%.
- Grew Electrical Americas backlog 33% to $15.2 billion at Jun. 30, 2026, with organic orders up 41% and a book-to-bill of 1.3.
- Electrical Global backlog jumped 103% to $3.6 billion, and Eaton named data centers and machine OEMs as the drivers of organic sales growth in both segments.
- Watch the margin, not the backlog: Electrical Americas operating margin fell to 27.5% from 29.5%, so volume is converting faster than profit; the Nov. 3, 2026 print is the test.
- Guarantees up to $105 billion of OpenAI's Ohio lease and commits $15 billion to SB Energy, which is what makes AEP Ohio's $4.2 billion transmission commitment financeable.
- The quarter ended Jul. 26, 2026 produced $96.2 billion of revenue, up 106%, with data center revenue of $89.0 billion, up 117%.
- With $56.6 billion of cash and marketable debt securities, that balance sheet is the real credit behind AEP's contracted Ohio load.
- Over 1–3 years, any slowdown in AI capital intensity transmits straight into the 69 GW contract book and the rate base built on it.
- Grid access in AEP Ohio's territory now carries a 12-year term, an 80%–90% take-or-pay floor and termination-fee collateral, so power cost becomes a fixed obligation.
- Meta co-signed AEP Ohio's $18 million bill-offset pledge on Aug. 18, 2026 with Amazon, Google, QTS and SoftBank Energy — the visible cost of being the load.
- Spent $31.1 billion of capital in the second quarter of 2026 — the demand behind AEP's contracted load, and the reason 12-year terms get signed.
- The mismatch: 12- to 20-year power obligations against hardware that turns over every three to four years.
- Raised 2026 capital spending guidance to $220 billion, with AWS revenue up 37% to $42.2 billion in the second quarter — the load AEP is contracting to serve.
- Turns trailing free cash flow negative as $220 billion of capital spending outruns operating cash, so honoring 12- to 20-year take-or-pay obligations depends on capital markets access.
- Joined AEP Ohio's $18 million bill-offset pledge in August 2026, the visible cost of operating in a tariffed jurisdiction.
- The offset is speed: with 69 GW contracted across ERCOT, PJM and SPP, operators that sign early get interconnection slots ahead of those that wait.