Huawei Ascend 950DT new price
>250,000 yuan (~$37,255)
up 20–50% vs. quotes two months earlier; availability Q4 2026
Cambricon Siyuan 690 price hike
+20% to +30%
above indicated levels from July 2026
Huawei Ascend 950PR (year-to-date)
~60K → >80K yuan
+~33% since start of 2026
Huawei Ascend 910C (year-to-date)
~90K → >110K yuan
+~22% since start of 2026
Smaller rivals (MetaX, Iluvatar CoreX)
similar increases
no specific figures disclosed
China-side HBM premium
several multiples
Chinese grey-market HBM vs. Western contract pricing, per Reuters
Event
For the first time, Chinese AI accelerators have pricing power
Reuters reported on Sept 10, 2026 that [Huawei Technologies] lifted the indicated price of its Ascend 950DT accelerator card above 250,000 yuan (~$37,255) — the first confirmed public price quote for the part and a jump of 20% to 50% from what customers were being quoted in July. Cambricon Technologies repriced its still-unlaunched Siyuan 690 20% to 30% above July indications, and smaller rivals MetaX and Iluvatar CoreX made similar moves with no specific figures disclosed. Older parts are not spared: the Ascend 950PR has risen to above 80,000 yuan from roughly 60,000 yuan at the start of the year, and the Ascend 910C to above 110,000 yuan from about 90,000 yuan.
This is not a normal channel-stocking cycle. Reuters directly attributed the increase to soaring high-bandwidth memory costs and the use of grey-market HBM channels — supplies that, per the report, typically cost 'several times' what buyers outside China pay. The export-control clock matters: Washington tightened restrictions on advanced HBM exports to China in December 2024, and the December-2024 framework has been the binding constraint that pushed Chinese chipmakers onto second-tier suppliers.
| Product | Vendor | July 2026 quote | Sept 2026 indicated | Change |
|---|---|---|---|---|
| Ascend 950DT | Huawei | Undisclosed | >250,000 yuan (~$37,255) | +20% to +50% |
| Siyuan 690 (next-gen) | Cambricon | Undisclosed | +20–30% vs. July | +20% to +30% |
| Ascend 950PR (YTD) | Huawei | ~60,000 yuan | >80,000 yuan | +~33% |
| Ascend 910C (YTD) | Huawei | ~90,000 yuan | >110,000 yuan | +~22% |
| Unnamed accelerators | MetaX / Iluvatar CoreX | n/d | Similar increases | Comparable |
Bottleneck
Why now: HBM3E and HBM4 supply is sold out, and China is on the wrong side of the wall
The HBM bottleneck is not new, but in 2026 it has hardened into a structural shortage rather than a cyclical squeeze. SK Hynix CEO Kwak Noh-jung told Reuters on July 10, 2026 — the day the company listed on Nasdaq — that 2027 'will be the worst year in the industry's history from the supply perspective,' with demand projected to outstrip supply beyond 2030. Bank of America sized the 2026 HBM market at $54.6 billion, up 58% year over year, while TrendForce tracks HBM4 contract pricing of $31–$36 per GB for 2H 2026 — roughly $17–18 per GB for the HBM3E generation it is replacing.
HBM contract pricing, $ per GB
HBM4 nearly doubles the per-GB price of HBM3E — the gap Chinese chipmakers pay on grey-market channels widens further.
Unit: $/GB
HBM3
~$200 / 24GB stack, 2H 2026
8.3
HBM3E
~$300 / 36GB stack, 2H 2026
8.3
HBM4
$31–36 / GB, 2H 2026
33.5
SK Hynix ran a record Q2 2026 — revenue of 79.3 trillion won (~$54.6 billion), up 51% quarter-on-quarter and 257% year-over-year, with operating profit of 60.5 trillion won (557% YoY). S&P Global put HBM revenue alone at 9.4 trillion won for the quarter, broadly in line with consensus. The growth is unmistakable, and so is the constraint: SK Hynix has guided to doubling wafer purchases and is prioritizing DDR5 expansion in some segments to manage capacity — a sign that even the leader is choosing which demand it can serve.
For Chinese chipmakers, the structural reality is harsher. CXMT — China's only DRAM/HBM producer — only began small-scale HBM3E production in late August 2026, and only for two known customers in test: T-Head (Alibaba's chip unit) and Cambricon Technologies. Mass production is targeted for end-2026, and meaningful HBM3E volume is more realistically a 2027 story. Until then, the supply stack is a Chinese version of 'several times' Western pricing plus grey-market availability — exactly the cost Reuters says Chinese chipmakers are now passing through.
Transmission
Cambricon catches the wave; the bigger rent goes to the foundries and HBM oligopoly
Cambricon Technologies is the listed Chinese name with the cleanest exposure to this transmission. Q1 2026 revenue hit 2.88 billion yuan, up 159% year-over-year from 1.11 billion yuan in Q1 2025; net income reached 1.01 billion yuan, up 185% YoY. The company is targeting roughly 500,000 AI accelerators in 2026, including as many as 300,000 Siyuan 590/690 units — though current yields on the 590/690 sit near 20% per Bloomberg sources, capping the upside. A 20–30% price hike on the 690 lifts unit ASPs without changing the unit ceiling, so the first-half 2026 margin expansion (gross margin 54.3% in Q1 2026 vs. 56.0% in Q1 2025) should re-accelerate in 2H 2026 as the new pricing flows through.
Cambricon quarterly revenue trajectory
Revenue ramp accelerates into the HBM-constrained window — the price hike layers on top of a volume ramp already underway.
Unit: RMB billion
Q1 2025
RMB billion
1.1
Q2 2025
RMB billion
1.8
Q3 2025
RMB billion
1.7
Q4 2025
RMB billion
1.9
Q1 2026
RMB billion, +159% YoY
2.9
SMIC is the foundry that actually fabricates these chips — the take-rate per accelerator does not change with HBM cost, but wafer volume does. SMIC's Q2 2026 revenue rose to $3.01 billion (+18% YoY), with utilization at 93.7% and pricing up more than 10% in key segments per Reuters' August 13 report. SMIC also raised prices for advanced chipmaking by up to 15% in August 2026 per Reuters — meaning SMIC has its own pricing-power story that compounds the accelerator vendors' pass-through.
- Cambricon Technologies — listed capture of scarcity rent on the 690; margin expansion in 2H 2026 depends on HBM supply not deteriorating further.
- SMIC — foundry take-rate is volume-bound; Q2 2026 utilization at 93.7% with 10%+ price hikes on advanced nodes.
- Hygon Information Technology — adjacent domestic AI accelerator player; Q2 2026 revenue 5.07B yuan (+65% YoY) but exposed to the same HBM pass-through.
- CXMT — owns the only long-term Chinese HBM alternative; HBM3E in small-scale production from late August, real volume 2027.
Upstream
The Western HBM oligopoly is the real beneficiary
Every dollar Chinese chipmakers add to accelerator pricing above their grey-market HBM cost accrues to the HBM producer at the top of the stack. The HBM market remains a three-player oligopoly — SK Hynix, Samsung Electronics, and Micron Technology — and all three just printed record quarters. SK Hynix took 62% of HBM shipments in Q2 2025 and is expected by UBS to capture roughly 70% of NVIDIA's HBM4 share for the Rubin platform in 2026. Samsung finally passed NVIDIA's 12-layer HBM3E qualification in September 2025 — its third try — and is now selling out its 2026 HBM allocation.
| Company | Latest quarter | Revenue | Operating profit | Net income | Comment |
|---|---|---|---|---|---|
| SK Hynix | Q2 2026 | 79.3T KRW (~$54.6B) | 60.5T KRW | 93.9T KRW | +51% QoQ, +257% YoY; HBM 9.4T KRW |
| Samsung Electronics | Q2 2026 | 171.5T KRW | 89.5T KRW | 71.6T KRW | DS (memory) segment driving margin |
| Micron Technology | Q3 FY26 (May 28, 2026) | $41.5B (record) | $33.3B | $28.2B | Implied HBM revenue >$10B for quarter |
Micron Technology is the cleanest US-listed expression of the thesis. Q3 FY2026 revenue hit a record $41.5 billion, up 73% quarter-on-quarter, with operating profit of $33.3 billion — a 55.9% net margin. The Street is modeling an analyst target of $1,513 against a recent print near $1,028, with 44 of 48 analyst ratings at Strong Buy or Buy. The narrative is straightforward: every Chinese accelerator shipped at a 20–50% markup allocates a disproportionate share of that markup to the HBM producer at the top of the bill of materials.
Downstream
Who pays: ByteDance, Alibaba, Tencent — and what it means for NVIDIA
The customers absorbing these price hikes are the same names that scrambled for Huawei chips after DeepSeek V4 launched in April 2026. Per Reuters, ByteDance, Tencent, and Alibaba all reached out about new orders once Huawei's Ascend 950 supernodes were scheduled to ship at scale — Huawei plans to ship roughly 750,000 Ascend 950PR units in 2026 and expects AI chip revenue to rise about 60% to ~$12 billion for the year. ByteDance alone is reportedly planning around $5.7 billion in Huawei AI chip purchases.
- [Huawei Technologies] — ByteDance's largest domestic supplier, followed by Cambricon Technologies and Iluvatar CoreX; Iluvatar doubled GPU shipments to ByteDance to 100,000 units this year.
- Alibaba Cloud (Bailian) and Tencent Cloud (TokenHub) launched DeepSeek V4 on release day, anchoring long-term domestic accelerator demand.
- NVIDIA — selling into a structurally smaller China AI accelerator pool (down to ~8% in 2026 per Bernstein, vs. 66% in 2024); the pricing power sits one layer up the stack.
The China-side math compounds the Western HBM case in a way the headlines miss. TrendForce's 2025 China AI accelerator shipment data already showed Huawei at 20.3% share and Cambricon Technologies at 2.9%, with Nvidia at 55% — a base that is shifting toward 90% domestic share in 2026. The result: more HBM consumed per China-shipped accelerator (because Chinese designs trail NVIDIA's HBM efficiency), more grey-market premium paid (because export controls restrict legal channels), and more rent flowing back to SK Hynix, Samsung Electronics, and Micron Technology. NVIDIA keeps the dollars in the data-center GPU, but the memory dollars migrate.
Horizons
Short term: watch 2H 2026 HBM contracts. Long term: 2027 is the worst year on record.
The Reuters report is a real-time read on 2H 2026 contract pricing for Chinese AI accelerators. Three catalysts matter in the next two quarters: (1) SK Hynix's next HBM contract repricing window — currently flagged by Counterpoint Research to push HBM4 contract pricing toward $35–$36/GB in 2H 2026; (2) CXMT's HBM3E yield data from the T-Head and Cambricon Technologies qualification lines, with first revenue shipments possible by year-end; (3) SMIC's pricing update after the 10–15% August 2026 wafer hikes land in customer bills.
Over the 1–3 year horizon, three structural scenarios compete. The base case: Chinese grey-market HBM costs remain elevated through 2027 as CXMT scales HBM3E, keeping the accelerator pricing-power trade intact and Western HBM margins at cycle peaks. The upside for Chinese chipmakers: a meaningful CXMT HBM3E ramp by mid-2027, compressing grey-market premia and forcing Cambricon/Huawei to compete on performance rather than availability — bad for their margins but good for unit volume. The downside for everyone: a 2027 inventory correction at the hyperscaler level that hits SK Hynix, Samsung Electronics, and Micron Technology together — CEO Kwak's 'demand outstripping supply beyond 2030' guidance is the bull case, but it depends on hyperscaler capex holding.
Where the transmission lands
- 20–30% Siyuan 690 price hike flows to 2H 2026 revenue per Reuters' Sept 10 scoop; 500K-unit 2026 target already in place.
- Q1 2026 revenue 2.88B yuan (+159% YoY) shows operating leverage ahead of the HBM-cost pass-through.
- Risks: 590/690 yields at ~20% cap volume; grey-market HBM cost could escalate faster than realized pricing.
- Q2 2026 utilization 93.7% with 10–15% price hikes on advanced nodes compounds the accelerator vendors' pass-through.
- Foundry take-rate is volume-bound: 500K Cambricon + 750K Huawei units in 2026 lock in advanced-node revenue.
- Read-through from Chinese accelerator volume into SMIC wafer demand is the cleanest 2H 2026 catalyst.
- HBM3E in small-scale production from late August 2026; Cambricon and T-Head (Alibaba) are the named test customers.
- Real HBM volume is a 2027 story — until then, CXMT is the only credible long-term substitute for the Western oligopoly.
- Watch 4Q 2026 yield data and any IPO follow-on as markers for HBM3E scale-up.
- CEO flagged 2027 as 'the worst year in the industry's history from the supply perspective' (Reuters, July 10, 2026).
- Q2 2026 HBM revenue 9.4T KRW (~$6.5B); ~70% HBM4 share for NVIDIA's Rubin platform per UBS.
- Chinese grey-market HBM premium flows back to SK Hynix's contract book within one quarter of accelerator price hikes.
- Passed NVIDIA's 12-layer HBM3E qualification in September 2025; 2026 HBM allocation sold out per KED Global.
- Q2 2026 operating profit 89.5T KRW confirms memory-segment pricing power at the cycle peak.
- Capture incremental share from SK Hynix as Chinese demand rotates away from grey market toward legitimate (but sold-out) channels.
- Q3 FY2026 revenue $41.5B (record), op profit $33.3B, net margin 55.9% — cleanest US expression of the HBM oligopoly.
- Analyst target $1,513 vs. ~$1,028 spot; 44 of 48 ratings are Strong Buy or Buy.
- Each 5% of incremental HBM share translates to roughly $2–3B of incremental revenue at current pricing.
- China AI accelerator share compressed to ~8% in 2026 per Bernstein (vs. 66% in 2024); domestic push is structural.
- Q2 FY2027 revenue $96.2B and operating profit $63.7B prove non-China demand absorbs the China rotation.
- Wins: HBM spend stays inside its ecosystem regardless of who builds the accelerator; loses: ASP elasticity as China substitutes accelerate.
- Q2 2026 revenue 5.07B yuan (+65% YoY) shows accelerating ramp in the same HBM-constrained window.
- Adjacent AI accelerator exposure but smaller unit base than Cambricon or Huawei; pricing-power pass-through is more limited.
- Watch 2H 2026 margin — HBM pass-through at smaller scale could compress gross margin before pricing catches up.
