Data centres: the physical layer under everything

Compute that cannot be powered or cooled cannot be deployed, which is why the constraint on AI capacity has moved from the chip supply chain into the electricity system and the construction industry. This branch covers the building itself: where the power comes from, how the heat gets out, and what sets the schedule.

For most of the industry's history the data centre was a solved problem: a building with power, cooling and network, built in a known way at a known cost. AI hardware broke each of those assumptions at once. A rack that draws over a hundred kilowatts cannot be air-cooled, cannot be fed by conventional distribution, and cannot be sited wherever land is cheap.

The result is that the binding constraint on deploying compute has moved out of the semiconductor supply chain and into the electricity system. An interconnection queue is measured in years. A large transformer has a lead time measured in years. Neither responds to demand the way a factory does, and neither can be resolved by paying more.

This branch separates the three things a facility has to deliver. Power covers the chain from the transmission network to the chip, including the generation operators are now building or contracting themselves. Cooling covers how heat gets from a processor to the outside air, and why liquid became necessary rather than optional. Sites and construction covers where capacity is built and what actually sets the schedule.

The dependency links from here run in both directions: up into the AI branch that consumes this capacity, and out into the energy branch, where the generation, transmission and equipment that make it possible are built.

How this breaks down

Split by what the facility has to deliver — power in, heat out, and the site that holds both.

What this depends on

4 of these are marked as a chokepoint: a handful of qualified suppliers, a multi-year lead time, or a single geography.

  • Supply chainChokepoint

    Firm electricity supply

    A flat, continuous, very large load requires generation and transmission that the system was not planned around.

    Energy and grid
  • Supply chainChokepoint

    Transformers and high-voltage switchgear

    Multi-year lead times on equipment that no facility can be energised without.

    Transformers
  • Supply chainChokepoint

    Liquid cooling components

    Cold plates, distribution units and couplings, from a supplier base sized for a niche that is no longer a niche.

    Direct-to-chip liquid
  • StandardChokepoint

    Interconnection procedures and queue position

    Connection is granted by a regulated study process, and a place in that queue is what actually dates a campus; no amount of capital moves a project up it.

    Interconnection queues

What depends on this

Other pages in this map that name Data centres as something they cannot do without.

Companies across Data centres

Every company named on a step below this page, ordered by how many of those steps it appears at. Compiled from the pages themselves rather than written separately, so the two cannot disagree. Not a ranking and not a recommendation.

92 more companies appear at a single step each; they are named on the pages for those steps.

How these pages are written

Each page explains one technology in plain language, states what it depends on, and names companies by what they supply at that step. Company roles are described qualitatively and deliberately carry no market shares, revenue figures or rankings — those change faster than an explainer can, and a stale number is worse than none. Ticker links point at company pages on this site and are provided for reference only.

Nothing here is investment advice, a recommendation, or a forecast. A company named on a page about a technology is not thereby a good investment, and the chokepoints described are structural facts about supply chains rather than predictions about prices. Technology moves; where a page describes something as unresolved or in development, that was true when it was written.

Plutux is not an investment adviser. Market data and AI-generated analysis are for information and education only, not investment advice. Disclaimer

© Plutux Technology Limited 2026